... underground works should be designed to the dictates of strict economy and efficiency , i.e. drains should be as short as possible , taking the most direct routes , requiring the fewest manholes and occupying the least land . In Fig . 5 ...
... underground works should be designed to the dictates of strict economy and efficiency , i.e. drains should be as short as possible , taking the most direct routes , requiring the fewest manholes and occupying the least land . In Fig . 5 ...
Page 204
... Underground Services The various underground services , water mains , sewers , gas mains , cables , etc. are located for convenience and in accordance with the technical requirements of each service . Water mains are laid with at least ...
... Underground Services The various underground services , water mains , sewers , gas mains , cables , etc. are located for convenience and in accordance with the technical requirements of each service . Water mains are laid with at least ...
Page 252
... Underground reservoir , 196 Underground services , location of , 204 University training , 15 Unwin , Sir Raymond , 211 , 213 , 216 Upland catchments , 195 , 196 Urban district councils , 115 Urban districts , 190 Urinals , 176 ...
... Underground reservoir , 196 Underground services , location of , 204 University training , 15 Unwin , Sir Raymond , 211 , 213 , 216 Upland catchments , 195 , 196 Urban district councils , 115 Urban districts , 190 Urinals , 176 ...
Contents
The Engineering Profession | 13 |
Engineering Aptitude | 34 |
Personnel and Administration of the Engineers | 59 |
Copyright | |
7 other sections not shown
Other editions - View all
Common terms and phrases
able according activated sludge administrative architect architectural authority bill of quantities bridge buildings carriageway centre cesspool emptiers cesspools chief assistant chief engineer civil engineering committee construction consulting engineer contract drawings contractor cost council detail direct labour drainage drains drawing office engineer's department estimates examination existing experience flow gradients grid highway highway engineering improve industry investigation junior knowledge land lay-out liable lighting local authorities main roads materials matter ment methods Ministry of Health municipal engineer necessary Ordnance Survey organization planner position possible practice prepared proportions purpose radial reason reinforced concrete residential responsible ring roads river scale scheme sections senior assistants sewage treatment sewerage sewers sludge soil soil survey specification staff street structures surface water tanks technical tender Testamur tion town planning traffic trolley-bus underground urban vehicles water supply zone