RECAPITULATION. B 0° 42′ 10° 48' Dist. 10 10 20 210 30 310 40 50 6o Distance. Total Dist. Dist. Dist. Dist. Dist. Dist. Dist. Dist. Dist. Dist. Straight Rad. Rad. Rad. Rad. Rad. Rad. Rad. Rad. Rad. Rad. Rad. Line. 8185.5 7162.5 57.30 3820 2865 229,2 1910 1637 1432,5 1146 955 Distance. Miles. 23.959 54.014) Westfield to N. Y. Line. 0.7765 0.1610 8.424 Con. River to Westfield. 1.079 1.117 7.06410.2651| 6.81810.4450 5.24610.3551| 4.432 1.136) 3.163] 0.7433 0.7007 0.5397 1.079 1.117 7.8405 0.2651 7.5613 0.4450 5.407 0.3550 5 13271 6757 3.163| 4.438 62.438 Total Con. River to N. Y. Line. Synopsis of estimated cost of Grading and Bridging North Route from Tekoa mountain to the State line. Station. Length. ¡Ascent De. Total Elev. of Elev. of Grade per Excavation, Cubic yards. Con. above mile Feet. Miles. Miles. Feet. Feet. Feet. Feet. From 872 River Ct. R. Earth. Rock. L. Rock Feet. Masonry. Perches Dolls. Cts. 814.5 802.10 77.20 36845.62 25488.22 1144.5 1143.48 82.18 113115.19 62553.6344322.78 156136.66 90016958.30 484.80 4170164440 9 1149.51146.99 22.00 5129.11 50 204.00 1374.5 1400.00 71.56 144463.04 106204.49 5849.15 349854.30 *300 5063.20 road bridge at sum- 2433 82 to 904 3200 0.606 955 5100 0.965 1.571 2168 16600 3.144 24.545 225.00 1194.00 2514 10000 1,894 31.096 2698 184003.485|34.581 189.5 192.039 14.85 23780.26) 1392.0 1418.77 17.76 44949.60 8120.70 4658.50 609.19 19477.00 15488.80 11552.51167823.08 3166 5800 1.099 43.447 3280 11400 2.159 45.606 3384 104001.969 47.575 3439 5500 1.042 48.617 2.50 1346.50 1065.00 1067.85 2.27 30475.04 17920.16 10158.32 9926.02 65.40 4500 21701 40 12979.41 31.20 12236 79 90.00 552.00 110.00 662.00 865. 14.32 676.32 850.68 975. 850.68 13.76 41665.48 Total cost of which is $1,144,637.16, keeping open the Pontoosuc Turnpike, averaging per mile, 9338 09 1493422.78235073.71167005.02 1881127.85 4122 47154.40 18172.50 43830 976841 11 Extract from Synopsis "A" of Garden Brook Route, from east bank of Con. River to Sta. 865 1-2 at Tekoa Mountain. 80526.96 72 38.00 113169.90 100 761.60 12578 25 402.10 26064/89 Total cost, Average cost per mile, Second Line from Sta. 1080, east side of Westfield River, to Chester Village. 2.722! 61644.24 114495.51 1683.33 4283.331 34418.41 300 1772.80 23557 77 47810.97 300 1772.80 line, through "D" line, to 3166 of Main line. 16799.43 127766.80 1201 3032.00 23020.67 10354.62 100 73.00 9949.95 11175.65 174953.28 49776.05 149297.07 220 3105.00 415.40 3600 75333 83 Stockbridge R. R. REMARKS.-* North Street bridge in Pittsfield, 40 ft. wide. † Common road bridge. Level of Hudson and east of River to Ches || $92,225.42.-$16,891.49 more than "D" line. 15 Table of Curves in the approximate location from Tekoa Mountain, via Pittsfield, to the western line of the State. Rad Rad. Rad. Rad. Rad. Rad.[ Rad. Rad. Rad. | Rad. Rad. Rad. | Rad. | Rad. Rad. Rad. Rad.] Rad. Rad. Rad. Rad.] 5730 4584. 38203274.28 2865. 2292 | 1910 | 1763 1637.1| 1528 |1432.5 1348.23 1273.3 1146 11041.8 996.52 955 10101 11020 2골이 30 310 320 30 40410 430 50 50 50 60 60 70 70 710 45 882 820 | 764 8595 1400 $993.35 1002.35 900 1010.35 1012.85 250 435 350 1056.10 1900 1625 |