210 40 Sta. RECAPITULATION. 00 42' 100 48' 19 11020 30 3.10 50 60 Total Distance. Dist. Straight Rad. Line. Miles. 0.1610 4.438 8.424 Con. River to Westfield. Total Con. River to N. Y. Line. Synopsis of estimated cost of Grading and Bridging North Route from Tekoa mountain to the State line. Masonry. Perchesi Grub: Amount. ment, REMARKS. River Ct. R. Dolls. Cts. Feet. walls. Feet. Feet. Piers. from 872 180.5|197.426 Sta. 972 is the same 10 904 3200 0.606 9.00 9.00 189.5 192.039 14.851 23780.26 2928.68 2938.58 9027.01 997409 as 8653 of Synopsis A 23.00 900 of G. Brook Route, 1174.80 600 17323 25 from Siony hill to Te- 229.5 222.692 27.78\ 39064.18) 10877.19 26436.001 370 895.402387.2012130 33317|22koa mountain. 1080 4900 0.928, 3.939 10.00 59.00 239.5 243.0 13 10.77 29643.10 1192.58 36832.67; 240 1809.60 704.00 3180 17163,07| This distance for 55295.81 250 1340.00 2516.50 56001 4292673 grade, curvature, and bridging is best, but 1903.50 4010 22240 97! $5891.12 more than 22939.23 295 873.201 146.20 12463|54|by east side of rivor. 1587| 970011.837113,541 76.00! 374.00! 554.56560.25 41.36! 19789.381 2115.54! 17015.01 130 204.00! 341.60 500! 11928168 1677 9000 1.705 15.246 122.00| 496.00 676.301655.50 171.57 1900.89 8057.64] 53766.19 200 1737.60 21451 49 1704 270010.511 15.7571 23.00 524.00) 701.50 672.33 154.7 11952.20 150.00 52195.641 380 5754.30 29716 35 1724.9 2090 0.396 16,153 32.50 556.50 737.00!7:26.25 181.71 18425.94 39.20 16343198 814.5 802.10 77.20 36845.62 25488.22 (153123.99 2901 8368.00 5425.00/2600 82000187 * 90 feet of this same 11144.51143.48 82.181113115.19 62553.63144322.78|156136.66 900 16958.301 434.801417011644409, length of common road bridge at sum5129.11 50 204.00 2433 82 mit. 2168 16600 3.144 24.545 225.00 1194.00 1374.5 1400.00171.56 144463.04|106204.49 5849.15 349854.30 *300 5063.20 186.00 67301527721211 Highest point at 2220 52000.984 25.529 17.501211.50 1392.0 1418.77 17.76 44949.60 4658.50 24502.73 25 127.60 67.2027001 14678 121 Washington summit is 1418.776 feet above 17864.02 7567 45 Con. River Bench, or 19731.05 30 66.00 56.40 16217181|1438.776 feet above 9144.721 74.80 3870|14 jordinary low water. $3828,74 included 251410000 1.89431.096 135.00 167.00 1225.0 1225.3071.28:53292.0:-) €03.19|19477.00 15488.30 269818400 3.485 34.5811 285.00/452.001 940,01 922.25181.781 17530.231 477.60 213043316 60 for piling, &c. thro' 111552.511167823.081 137501 39282/96. Ainsiale meadowa. 721 es. SYNOPSIS OF ROUTES- Continued.) Bridg. Masonry. Perches. Grub. Amount. ment. Abut. Culverts bing. length ments & and side Feet. Miles. Miles. Cubic yrs. Feet.1 Piers. Cte. Dolls. 16547.53 100 1120.00 7549/51 2831 12100 2.292 37.101| 15.00 1226.50 950. 964.03 6.54 97852.51 79808.6% *28 560.00 263.101 21786 15 2908) 7700 1.459|38.561 5.00 462.00 945. 939.80 3.42 79930.22 10276.99 79739.98 144 1322.80 324.30 28164/28 3034 12600 2.386 40.946 107.50 1334.00 31003.80 111552.241 120 4424.00 253.40 11001 54391 18 1306632000.607 41.553 2290.50 6512.16 726 288.00 65.40 3895 95 3108] 4200 0.795 42.318 10.00 1344,00 17920.16 9926.02 65.40 45001 21701 40 31661 5800 1.099 13.447 2.50/1346.50 10158.32 12979.41 31.20 1223679 3280/114002.159 45.606 90 00552 001 975. 972.50 41 68 124408 74 80526.96 172 38.00 402.10 26064 89 33841040091.969.47 5751 110.001662.00 565. 848.95 55.81 65464 55 113169.901 1001 761.60 76.801 2950! 30285/31 3439 5500 1.042 18.017 14,32 676.32 850.68 850.68 13 76 41665.48 12578 25 670.00 9338|09 Total. 118.617 1493422.783.073.71|167005.02 881127.85/4122 47154.40 18172.50 4383097634111 Extract m Synopsis “A” of Garden Brook Route, from east bank of Con. River to Sta. 865 1-2 at Tekoa Mountain. 169965/54 Total cost, 1146806 65 do.substituting "D" line.163.104 | Average cost per mile, 18224.97 Total cost of which is $1,144,637.16, keeping open the Poninosuc Turnpike, averaging per noile, 18138190 Second Line from Sta. 1030, east side of Westfield River, to Chester Village. From 1099 13392.561 205.06 13177,84 31418.41 300 1772.30 2355777 2.722 4253.331 47810.97 3001 1772.80 205.06 3703561 Second line from Sta. 2903 "A" line, through "D" line, to 3166 of Main line. to 3028 112000 2.2731 2.2731 99.00 98.00 16795.43 127766.301 120 3032.00 253.40 2100 41369172 9200 1.742 4.015: 24.00 122.00 230 20.67 10351,621 100 73.00 130.80 1500 2197542 “ 3175}! 555011.051 5.006 2.00 2.00 1063 1067.85 2.30 29357.94 99 19.95 11175.65 31.20 1198869 49770,113 119297.07 220 3105.00 415.40 3600 7533383 2.500 De. Dese. | Elev.of | Elev.of Grade. Ascent. Grade B'h on ab. B. Mile. scent. Ct. R. onCI.R. Earth. Rock. Loose R. Teet. Feet. 5.00 157. 935. 931.50122. 1052.50 1072.85.15.01 120144.021 1052.50 level. 83:7.75 1062.50 1062. 12.57 53960.53 1065.00 1067.85 2.27 30475.0.1 8600|1.629 1.6291 42. to | 1166 42. 283.00 273.00 25 781 52851.27 2600,001 1043/1072. 13.12 7593 1.05 100610681 12.57 691:13,59 ان.114495 6 3129 GRADES. O to 1.57214 24.481 15 8595 RECAPITULATION. GRADES. Total Elev. of Ter. Elev. of Costograding) Length. mini ab. & be. Gr. atdo. and bridging REMARKS. cut River Con. River 10 20 30 40 50 60 70 1 1 low Worcester ab. & be. 1 90 1 Bench. Level. 10 ft. Bench. 20 30 40 1 50 60 70 80 82 Miles R. R. Depot. low do. Dolls. Cts. North Route from 1 Eastern, -215.990 232.916 850.680 Western, 850.680 and Pittsfield, to Western, 976.84111 $20,092.00 per mile. 437.264 +437.264 1 Total cost by substituting 2d line as above, 954.058 50 19.623.00 LO LO STATIONS. 10 110 120 130 20 220 30 370370 1340| 40 440 440 50 540 540 160 1640 70 710| 454 REMARKS. 5730 I 4584 3820 3274.281 2865.1 2292 | 1910 1763|1637.1 1528 1432.5 1348.23 1273.3 1146 11041.8|996.52 955 882 820 764 11001 9001 5001 550 This curve may be changed te 1550 5 1.2 degrees, on radius of 936) 1000 1041.8, by building into the river, at an additional cost on 700 the whole of 2d grade of 400 $6670.21. 550 10501 300 435 1400 900 250 500 400 350 1900 1072.35) 16251 1080.601 825 0089.35 1092.851 350 350 REMARKS. 66 16 TABLE OF CURVES- Continued.) Rad. Rad. Rad. | Rad.sRad. Rad. Rad Rad., Rad. Rad. Rad. Rad. | Rad. Rad. Rad. Rad. Rad. Rad, Rad. Rad. Rad. Rad. Rad. 10 20 270 30 370 370 370| 40 41° 4.10 50 520 570 69 6101 70 71° 45' Stations. 1° 110110110 955 882 820 764 8595 110001 2425 2860 475 1975 1625 2400 800 1005 1350 700 45751 1402.60 to 1409.60 1423.10 to 1440.60 1750 66 66 66 66 1455.60 1500 1469.50 to 1502.50 3300 1511.50 to 1525.50 1536. to 1578.50 1400 1631.50;5300) 1653.50 to 1658. 450 1662.50 to 1677. 1550 1704. 1776.75 4975 1100 1025 500 1972.25 800 2025 1200 66 TABLE OF CURVES- Continued.) | Rad. Rad. Rad. Rad. Rad. Rad. Rad. Rad- Rad. Rad. Rad. Rad. Rad. Rad. Rad. Rad. Rad. Rad. Rad. Rad. Rad. Stations. 20 219 3? 310 REMARKS. 425 3550 1650 2775 17501 400 2500 28251 1000) 2831.50 to 2852.50 2100 1050) 3000 1500 1400 1150 2625 1200 4831 1250 RECAPITULATION. Dist. Dist. Total Miles. 6.255.0.943.3.543 0.455 3.627 2.647) 1.347 0.3741.6870.460/1.837 0.596 0.198 0.5460.2650.511 0.3590.307\0.4270.066 0.724 21,433 48.617 |